Aloha

Ordered a Ranger on December 1st. Supercab through ROVP. Hoped for April delivery, but May was realistic. According to the tracking site, it went into production last Monday and is still in production. Last Monday, the tracking site gave an estimated delivery of 51 days then on Wednesday jumped up to 58 days. I know the site is an estimate, but still, *something* changed and moved the date to the right. I guess I have a few question that maybe you guys can answer:

1. How long should it normally take to build a standard Lariat supercab with a spray-in bedliner?

2. I'm hearing there are delays at the factory. Anything from steering wheels inventory issues to delays on doing the bedliner. Can anyone confirm?

3. Should my dealer be able to get that information? I've emailed him twice. Normally, very responsive but when I've asked for a status, I get nothing but crickets.

Currently we are a 1 vehicle family and has worked well, but the wife is looking to go back to work. A conservative timeline was taken into account but long delays starts causing a problem. Even after production, I'd still need it shipped out to Hawaii and my understanding is that getting cars out to the West Coast is pretty slow going right now. Once there, I'd think getting on a ship doesn't present too much of a problem.

Mahalo

Link to comment
Share on other sites

1. About as long as every other plant. Start to finish about 24 hours. Spray in bedliner is done off site. 

2. The steering wheel shortage did make it to us but it didn't last long and everything is back to normal. I think keypads are still an issue.

3. Yes your dealer has access to all of that information. 

Link to comment
Share on other sites

3 minutes ago, fuzzymoomoo said:

1. About as long as every other plant. Start to finish about 24 hours. Spray in bedliner is done off site. 

2. The steering wheel shortage did make it to us but it didn't last long and everything is back to normal. I think keypads are still an issue.

3. Yes your dealer has access to all of that information. 

 

Thanks for that quick reply.

Ya, didn't think it was much more than a couple days to build a truck...Max. My Lariat is pretty standard. No keypad. Spray in bedliner is the only larger option. I'll give the rest of the week then make a personal visit to the dealer.

Link to comment
Share on other sites

We should point out that "In Production" doesn't mean it's actually being built.  My truck went "In Production" on Dec. 23 but wasn't built until Jan. 16, and then delivered to dealer on Feb. 6 which was only 2 days later than their original estimate.  "In Production" is a pretty nebulous term which just means they are making sure they have all the parts, are getting it scheduled, etc. and ready to build. Sorry to say, but it could still be several weeks before it gets assembled.

Link to comment
Share on other sites

18 minutes ago, hared said:

We should point out that "In Production" doesn't mean it's actually being built.  My truck went "In Production" on Dec. 23 but wasn't built until Jan. 16, and then delivered to dealer on Feb. 6 which was only 2 days later than their original estimate.  "In Production" is a pretty nebulous term which just means they are making sure they have all the parts, are getting it scheduled, etc. and ready to build. Sorry to say, but it could still be several weeks before it gets assembled.

 

Thanks Hared. That makes sense and yes "nebulous" is one way of putting it from what I've been hearing. Misleading, might be another since the Ford site says, " Your order is being manufactured at one of our factories. This can take a few days."  24 days (in your case) is a bit more than a "few" days. 10(so far in my case) is also starting to stretch the definition of "few" ?

Anyway, I'm good with a mid-May delivery, but I need to be prepared for the possibility of delivery much further out than the 53 days days currently showing. Hopefully, the dealer will have some information when I go see him tomorrow.

Link to comment
Share on other sites

28 minutes ago, hared said:

We should point out that "In Production" doesn't mean it's actually being built.  My truck went "In Production" on Dec. 23 but wasn't built until Jan. 16, and then delivered to dealer on Feb. 6 which was only 2 days later than their original estimate.  "In Production" is a pretty nebulous term which just means they are making sure they have all the parts, are getting it scheduled, etc. and ready to build. Sorry to say, but it could still be several weeks before it gets assembled.

The line was also moving a LOT slower in December/January than it is now. It's up to full speed now. 

  • Like 1
Link to comment
Share on other sites

On 3/26/2019 at 6:41 AM, fuzzymoomoo said:

1. About as long as every other plant. Start to finish about 24 hours. Spray in bedliner is done off site. 

2. The steering wheel shortage did make it to us but it didn't last long and everything is back to normal. I think keypads are still an issue.

3. Yes your dealer has access to all of that information. 

 

Well, I won't need to speak with the dealer. Status just updated today to the next level of Awaiting Transportation. Step forward.

Seems like whatever issue I'm impatient about get resolved on it's own right after I inquire. Does that need I need to be more patient or inquire earlier? ;-)

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...