ice-capades Posted December 16, 2018 Author Share Posted December 16, 2018 (edited) PRODUCTION WEEK SCHEDULING INFORMATION FOR THE WEEK OF 01/07/2019 2019 ECOSPORT No Scheduling 2019 EDGE Scheduling for Build Week 02/25/2019 2019 ESCAPE No Scheduling 2019 EXPEDITION Scheduling for Build Week 01/28/2019 2019 EXPLORER No Scheduling 2019 F-150 Scheduling for Build Week 01/28/2019 2019 FIESTA Scheduling for Build Week 02/25/2019 2019 FLEX Scheduling for Build Week 02/25/2019 2019 FUSION No Scheduling 2019 MUSTANG Scheduling for Build Week 02/25/2019 2019 RANGER Scheduling for Build Week 02/25/2019. Until the Okay to Buy has been achieved, retail orders will not be selected for scheduling. Only retail orders that have been verified through the Retail Order Verification Program will be selected for scheduling. 2019 F-SERIES SD Scheduling for Build Week 01/28/2019 2019 TAURUS No Scheduling 2019 TRANSIT Scheduling for Build Week 02/25/2019 2019 TRANSIT CONNECT No Scheduling 2019 LINCOLN CONTINENTAL Scheduling for Build Week 02/25/2019 2019 LINCOLN MKC Scheduling for Build Week 02/25/2019 2019 LINCOLN MKT Scheduling for Build Week 02/25/2019 2019 LINCOLN MKZ Scheduling for Build Week 02/25/2019 2019 LINCOLN NAUTILUS Scheduling for Build Week 02/25/2019 2019 LINCOLN NAVIGATOR Scheduling for Build Week 01/28/2019 Edited December 16, 2018 by ice-capades Formatting 1 Link to comment Share on other sites More sharing options...
NDB38 Posted January 2, 2019 Share Posted January 2, 2019 I placed an order for a 2019 Expedition on Oct 23rd. As of today, 10 weeks later, my dealer does not have a VIN or a build date. I was told at the time of my order, I should receive the Expedition right before or right after Christmas. Today I used the chat function on Ford.com and the operator said the order is "processing" and expected delivery is Feb 22nd. Do you know of any delays at the plant? Link to comment Share on other sites More sharing options...
fuzzymoomoo Posted January 3, 2019 Share Posted January 3, 2019 4 hours ago, NDB38 said: I placed an order for a 2019 Expedition on Oct 23rd. As of today, 10 weeks later, my dealer does not have a VIN or a build date. I was told at the time of my order, I should receive the Expedition right before or right after Christmas. Today I used the chat function on Ford.com and the operator said the order is "processing" and expected delivery is Feb 22nd. Do you know of any delays at the plant? No delays that I'm aware of, it's just very hard for them to produce expeditions the way they should to be able to keep up with demand. Same goes for Navigators. They're combined with super duty at the same plant and they’re operating above capacity right now to try and keep up Link to comment Share on other sites More sharing options...
majestik Posted January 3, 2019 Share Posted January 3, 2019 I just wanted to say thank you to @ice-capades for this info. Very useful. Thank you 2 Link to comment Share on other sites More sharing options...
ice-capades Posted January 11, 2019 Author Share Posted January 11, 2019 PRODUCTION WEEK SCHEDULING INFORMATION FOR THE WEEK OF 01/14/2019 2019 ECOSPORT Scheduling for Build Weeks 03/04/2019 & 03/11/2019 2019 EDGE Scheduling for Build Week 03/04/2019 2019 ESCAPE Scheduling for Build Weeks 02/04/2019, 02/11/2019, 02/18/2019 & 02/25/2019 2019 EXPEDITION Scheduling for Build Weeks 02/04/2019 & 02/11/2019 2019 EXPLORER Balanced Out 2020 EXPLORER Startup Scheduling on 02/28/2019 2019 F-150 Scheduling for Build Weeks 02/04/2019 & 02/11/2019 2019 FIESTA No Scheduling 2019 FLEX Scheduling for Build Week 03/04/2019 2019 FUSION Scheduling for Build Weeks 02/04/2019, 02/11/2019, 02/18/2019 & 02/25/2019 2019 MUSTANG Scheduling for Build Week 03/04/2019 2019 RANGER Scheduling for Build Week 03/04/2019 2019 F-SERIES SD Scheduling for Build Weeks 02/04/2019 & 02/11/2019 2019 TAURUS Balanced Out 2019 TRANSIT Scheduling for Build Week 03/04/2019 2019 TRANSIT CONNECT Scheduling for Build Weeks 03/04/2019 & 03/11/2019 2020 LINCOLN AVIATOR No Scheduling Information Available 2019 LINCOLN CONTINENTAL Scheduling for Build Week 03/04/2019 2019 LINCOLN MKC Scheduling for Build Week 03/04/2019 2019 LINCOLN MKT Scheduling for Build Week 03/04/2019 2019 LINCOLN MKZ Scheduling for Build Week 03/04/2019 2019 LINCOLN NAUTILUS Scheduling for Build Week 03/04/2019 2019 LINCOLN NAVIGATOR Scheduling for Build Weeks 02/04/2019 & 02/11/2019 Link to comment Share on other sites More sharing options...
ice-capades Posted January 19, 2019 Author Share Posted January 19, 2019 PRODUCTION WEEK SCHEDULING INFORMATION FOR THE WEEK OF 01/21/2019 2019 ECOSPORT Scheduling for Build Weeks 03/18/2019 & 03/25/2019 2019 EDGE Scheduling for Build Weeks 03/11/2019 & 03/18/2019 2019 ESCAPE Retail Scheduling 2019 EXPEDITION Scheduling for Build Week 02/18/2019 2019 EXPLORER Balanced Out 2020 EXPLORER Startup Scheduling on 02/28/2019 2019 F-150 Scheduling for Build Week 02/18/2019 2019 FIESTA Scheduling for Build Weeks 03/04/2019, 03/11/2019 & 03/18/2019 2019 FLEX Scheduling for Build Week 03/18/2019 2019 FUSION Retail Scheduling 2019 MUSTANG Scheduling for Build Weeks 03/11/2019 & 03/18/2019 2019 RANGER Scheduling for Build Weeks 03/11/2019 & 03/18/2019 2019 F-SERIES SD Scheduling for Build Week 02/18/2019 2019 TAURUS Balanced Out 2019 TRANSIT Scheduling for Build Week 03/11/2019 2019 TRANSIT CONNECT Scheduling for Build Weeks 03/18/2019 & 03/25/2019 2020 LINCOLN AVIATOR Startup Scheduling on 02/28/2019 2019 LINCOLN CONTINENTAL Scheduling for Build Weeks 03/11/2019 & 03/18/2019 2019 LINCOLN MKC Scheduling for Build Weeks 03/11/2019 & 03/18/2019 2019 LINCOLN MKT No Scheduling 2019 LINCOLN MKZ Scheduling for Build Weeks 03/11/2019 & 03/18/2019 2019 LINCOLN NAUTILUS Scheduling for Build Weeks 03/11/2019 & 03/18/2019 2019 LINCOLN NAVIGATOR Scheduling for Build Weeks 02/18/2019 Link to comment Share on other sites More sharing options...
ice-capades Posted January 26, 2019 Author Share Posted January 26, 2019 PRODUCTION WEEK SCHEDULING INFORMATION FOR THE WEEK OF 01/28/2019 2019 ECOSPORT No Scheduling 2019 EDGE Scheduling for Build Week 03/25/2019 2019 ESCAPE Retail Scheduling 2019 EXPEDITION Scheduling for Build Week 02/25/2019 2019 EXPLORER Balanced Out 2020 EXPLORER Startup Scheduling on 02/28/2019 2019 F-150 Scheduling for Build Week 02/25/2019 2019 FIESTA Scheduling for Build Weeks 03/25/2019 2019 FLEX Scheduling for Build Week 03/25/2019 2019 FUSION Retail Scheduling 2019 MUSTANG Scheduling for Build Weeks 03/25/2019 2019 RANGER Scheduling for Build Weeks 03/25/2019 2019 F-SERIES SD Scheduling for Build Week 02/25/2019 2019 TAURUS Balanced Out 2019 TRANSIT Scheduling for Build Week 03/18/2019 2019 TRANSIT CONNECT Cleanup Scheduling 2020 LINCOLN AVIATOR Startup Scheduling on 02/28/2019 2019 LINCOLN CONTINENTAL Scheduling for Build Week 03/25/2019 2019 LINCOLN MKC Scheduling for Build Week 03/25/2019 2019 LINCOLN MKT Scheduling for Build Week 03/25/2019 2019 LINCOLN MKZ Scheduling for Build Week 03/25/2019 2019 LINCOLN NAUTILUS Scheduling for Build Week 03/25/2019 2019 LINCOLN NAVIGATOR Scheduling for Build Weeks 02/25/2019 Link to comment Share on other sites More sharing options...
escapeman Posted January 26, 2019 Share Posted January 26, 2019 Ice Capades. Is there a hold on Nautilus production on vehicles with the Tech package that has the lane assist and adaptive cruise control? As I was at a Lincoln dealer having an issue fixed with my MKX, and a salesperson came up to me and introduced himself. I told him that I have a Nautilus on order already, we got talking together about the vehicle and he offered this info to me. Thank you in advance. Shoe. Link to comment Share on other sites More sharing options...
ice-capades Posted January 27, 2019 Author Share Posted January 27, 2019 14 hours ago, escapeman said: Ice Capades. Is there a hold on Nautilus production on vehicles with the Tech package that has the lane assist and adaptive cruise control? As I was at a Lincoln dealer having an issue fixed with my MKX, and a salesperson came up to me and introduced himself. I told him that I have a Nautilus on order already, we got talking together about the vehicle and he offered this info to me. Thank you in advance. Shoe. I don't have access to Lincoln specific scheduling information but can tell you that there have been scheduling/commodity issues with the Ford Co-Pilot360 Assist+ option (Adaptive Cruise, Lane Centering, Evasive Steering Assist, Navigation). The scheduling system, monitored and managed by the Regional Scheduler, is usually pretty good at making exceptions for commodity issues on Retail Orders. For unscheduled Retail Orders, Dealers can request that the order be re-prioritized at "01" which helps push/force an order to schedule ASAP. Link to comment Share on other sites More sharing options...
ice-capades Posted February 2, 2019 Author Share Posted February 2, 2019 PRODUCTION WEEK SCHEDULING INFORMATION FOR THE WEEK OF 02/04/2019 2019 ECOSPORT No Scheduling 2019 EDGE Cleanup Scheduling 2019 ESCAPE No Scheduling 2019 EXPEDITION Cleanup Scheduling 2019 EXPLORER Balanced Out 2020 EXPLORER Startup Scheduling on 02/28/2019 2019 F-150 Cleanup Scheduling 2019 FIESTA Cleanup Scheduling 2019 FLEX Cleanup Scheduling 2019 FUSION No Scheduling 2019 MUSTANG Cleanup Scheduling 2019 RANGER Cleanup Scheduling 2019 F-SERIES SD Cleanup Scheduling 2019 TAURUS Balanced Out 2019 TRANSIT Scheduling for Build Week 03/25/2019 2019 TRANSIT CONNECT Cleanup Scheduling 2020 LINCOLN AVIATOR Startup Scheduling on 02/28/2019 2019 LINCOLN CONTINENTAL No Scheduling 2019 LINCOLN MKC Cleanup Scheduling 2019 LINCOLN MKT Cleanup Scheduling 2019 LINCOLN MKZ Cleanup Scheduling 2019 LINCOLN NAUTILUS Cleanup Scheduling 2019 LINCOLN NAVIGATOR Cleanup Scheduling Link to comment Share on other sites More sharing options...
ice-capades Posted February 2, 2019 Author Share Posted February 2, 2019 The following updated order guides have been uploaded to the Product Order Guides section along with the update notes. 2019 Edge Order Guide 2019 Expedition Order Guide 2019 F-150 Order Guide 2019 F-150 Police Responder Order Guide 2019 Mustang Order Guide 2019 Shelby GT350 & GT350R Order Guide 2019 Transit Order Guide 2019 Lincoln MKC Black Label Order Guide Link to comment Share on other sites More sharing options...
ice-capades Posted February 5, 2019 Author Share Posted February 5, 2019 02/04/2019 NEW VEHICLE DEMONSTRATION/DELIVERY HOLD Certain 2019 Ranger Vehicles - Brake Transmission Shift Interlock Override - Wire Routing Link to comment Share on other sites More sharing options...
ice-capades Posted February 7, 2019 Author Share Posted February 7, 2019 2019MY Mustang scheduling has been cancelled for this week. Scheduling will resume next Thursday, February 14th. Link to comment Share on other sites More sharing options...
fuzzymoomoo Posted February 7, 2019 Share Posted February 7, 2019 4 hours ago, ice-capades said: 2019MY Mustang scheduling has been cancelled for this week. Scheduling will resume next Thursday, February 14th. FWIW the plant has been down for the last 3 weeks because of a parts shortage. As of now they’re scheduled to resume production on Monday but that could change. Link to comment Share on other sites More sharing options...
ice-capades Posted February 9, 2019 Author Share Posted February 9, 2019 PRODUCTION WEEK SCHEDULING INFORMATION FOR THE WEEK OF 02/11/2019 2019 ECOSPORT Scheduling for Build Weeks 04/01/2019 & 04/08/2019 2019 EDGE Scheduling for Build Week 04/01/2019 2019 ESCAPE Scheduling for Build Weeks 03/04/2019, 03/11/2019, 03/18/2019 & 03/25/2019 2019 EXPEDITION Scheduling for Build Weeks 03/04/2019 & 03/11/2019 2020 EXPLORER Startup Scheduling on 02/28/2019 2019 F-150 Scheduling for Build Weeks 03/04/2019 & 03/11/2019 2019 FIESTA Scheduling for Build Week 04/01/2019 2019 FLEX Scheduling for Build Week 04/01/2019 2019 FUSION Scheduling for Build Weeks 03/04/2019, 03/11/2019, 03/18/2019 & 03/25/2019 2019 MUSTANG Scheduling for Build Week 04/08/2019 2019 RANGER Scheduling for Build Week 04/01/2019 2019 F-SERIES SD Scheduling for Build Weeks 03/04/2019 & 03/11/2019 2019 TRANSIT Scheduling for Build Week 04/01/2019 2019 TRANSIT CONNECT Scheduling for Build Weeks 04/01/2019 & 04/08/2019, 04/15/2019 & 04/22/2019 2020 LINCOLN AVIATOR Startup Scheduling on 02/28/2019 2019 LINCOLN CONTINENTAL Scheduling for Build Week 04/08/2019 2019 LINCOLN MKC Scheduling for Build Week 04/01/2019 2019 LINCOLN MKT Scheduling for Build Week 04/01/2019 2019 LINCOLN MKZ Scheduling for Build Week 04/01/2019 2019 LINCOLN NAUTILUS Scheduling for Build Week 04/01/2019 2019 LINCOLN NAVIGATOR Scheduling for Build Weeks 03/04/2019 & 03/11/2019 Link to comment Share on other sites More sharing options...
Zooks527 Posted February 14, 2019 Share Posted February 14, 2019 (edited) On 2/7/2019 at 12:28 PM, fuzzymoomoo said: FWIW the plant has been down for the last 3 weeks because of a parts shortage. As of now they’re scheduled to resume production on Monday but that could change. So how does a 3 week downtime effect the overall schedule? The simplistic assumption would be that everything in place would slide by 3 weeks (i.e., the 1/21 production week slides to 2/11, and so on through the stagger), but looking at the schedule updates the ice-capades has posted I don't think I see that. Have I missed something here (for example, when the list notes " Scheduling for Build Week 04/08/2019", is what's really happening is the earlier week of 3/18 schedule just being slid to that point)? Edited February 14, 2019 by Zooks527 Typo Link to comment Share on other sites More sharing options...
fuzzymoomoo Posted February 14, 2019 Share Posted February 14, 2019 1 hour ago, Zooks527 said: So how does a 3 week downtime effect the overall schedule? The simplistic assumption would be that everything in place would slide by 3 weeks (i.e., the 1/21 production week slides to 2/11, and so on through the stagger), but looking at the schedule updates the ice-capades has posted I don't think I see that. Have I missed something here (for example, when the list notes " Scheduling for Build Week 04/08/2019", is what's really happening is the earlier week of 3/18 schedule just being slid to that point)? Best answer I can give you is to be determined Link to comment Share on other sites More sharing options...
ice-capades Posted February 16, 2019 Author Share Posted February 16, 2019 PRODUCTION WEEK SCHEDULING INFORMATION FOR THE WEEK OF 02/18/2019 2019 ECOSPORT Scheduling for Build Weeks 04/15/2019 & 04/22/2019 2019 EDGE Scheduling for Build Weeks 04/08/2019 & 04/15/2019 2019 ESCAPE Retail Scheduling 2019 EXPEDITION Scheduling for Build Week 03/18/2019 2020 EXPLORER Startup Scheduling on 02/28/2019 2019 F-150 Scheduling for Build Weeks 03/18/2019 & 03/25/2019 2019 FIESTA Scheduling for Build Weeks 04/08/2019 & 04/15/2019 2019 FLEX Scheduling for Build Weeks 04/08/2019 & 04/15/2019 2019 FUSION Retail Scheduling 2019 MUSTANG Scheduling for Build Week 04/15/2019 2019 RANGER Scheduling for Build Weeks 04/08/2019 & 04/15/2019 2019 F-SERIES SD Scheduling for Build Week 03/18/2019 2019 TRANSIT Scheduling for Build Week 04/08/2019 2019 TRANSIT CONNECT Cleanup Scheduling. Final 2019MY Transit Connect Orders Due on Thursday 02/21/2019 2020 LINCOLN AVIATOR Startup Scheduling on 02/28/2019 2019 LINCOLN CONTINENTAL Scheduling for Build Week 04/15/2019 2019 LINCOLN MKC Scheduling for Build Weeks 04/08/2019 & 04/15/2019 2019 LINCOLN MKT No Scheduling 2019 LINCOLN MKZ Scheduling for Build Weeks 04/08/2019 & 04/15/2019 2019 LINCOLN NAUTILUS Scheduling for Build Weeks 04/08/2019 & 04/15/2019 2019 LINCOLN NAVIGATOR Scheduling for Build Week 03/18/2019 Link to comment Share on other sites More sharing options...
ice-capades Posted February 23, 2019 Author Share Posted February 23, 2019 PRODUCTION WEEK SCHEDULING INFORMATION FOR THE WEEK OF 02/25/2019 2019 ECOSPORT AFO (Allocation Fulfillment Scheduling) Scheduling on Monday 02/25/2019 2019 EDGE Scheduling for Build Week 04/22/2019 2019 ESCAPE Retail Scheduling 2019 EXPEDITION Scheduling for Build Week 03/25/2019 2020 EXPLORER Startup Scheduling on 02/28/2019. Until the “OK to Buy” status has been achieved, Retail Orders will not be selected for scheduling. 2019 F-150 AFO (Allocation Fulfillment Scheduling) Scheduling on Monday 02/25/2019 2019 FIESTA Scheduling for Build Week 04/22/2019 2019 FLEX Scheduling for Build Week 04/22/2019 2019 FUSION Retail Scheduling 2019 MUSTANG Scheduling for Build Week 04/22/2019 2019 RANGER Scheduling for Build Week 04/22/2019 2019 F-SERIES SD Scheduling for Build Week 03/25/2019 2019 TRANSIT Scheduling for Build Week 04/15/2019 2019 TRANSIT CONNECT Final 2019MY Transit Connect Orders Due on Thursday 02/21/2019 2020 LINCOLN AVIATOR Startup Scheduling on 02/28/2019. Until the “OK to Buy” status has been achieved, Retail Orders will not be selected for scheduling. 2019 LINCOLN CONTINENTAL Scheduling for Build Week 04/22/2019 2019 LINCOLN MKC Scheduling for Build Week 04/22/2019 2019 LINCOLN MKT No Scheduling 2019 LINCOLN MKZ Scheduling for Build Week 04/22/2019 2019 LINCOLN NAUTILUS Scheduling for Build Week 04/22/2019 2019 LINCOLN NAVIGATOR Scheduling for Build Week 03/25/2019 Link to comment Share on other sites More sharing options...
rmc523 Posted February 25, 2019 Share Posted February 25, 2019 So for Aviator, is "startup" meaning they're going to start building pre-production models to test the plant? Or those are actual for-sale units that will eventually go to customers, but it's refining/testing the production process before full production begins? Link to comment Share on other sites More sharing options...
ice-capades Posted February 25, 2019 Author Share Posted February 25, 2019 17 minutes ago, rmc523 said: So for Aviator, is "startup" meaning they're going to start building pre-production models to test the plant? Or those are actual for-sale units that will eventually go to customers, but it's refining/testing the production process before full production begins? Startup Scheduling is just that and has nothing to do with production. Basically, After the plant re-tooling is completed and pre-production units are produced, those units are used for promotion and Company use only and are not sold to the public. This is the quick answer. Link to comment Share on other sites More sharing options...
rmc523 Posted February 25, 2019 Share Posted February 25, 2019 22 minutes ago, ice-capades said: Startup Scheduling is just that and has nothing to do with production. Basically, After the plant re-tooling is completed and pre-production units are produced, those units are used for promotion and Company use only and are not sold to the public. This is the quick answer. That's why I asked. Does anyone remember when actual production is supposed to start? Link to comment Share on other sites More sharing options...
akirby Posted February 25, 2019 Share Posted February 25, 2019 31 minutes ago, rmc523 said: That's why I asked. Does anyone remember when actual production is supposed to start? Don't have to remember thanks to Ice-Capades: Job 1 5/6 1 Link to comment Share on other sites More sharing options...
rmc523 Posted February 25, 2019 Share Posted February 25, 2019 1 hour ago, akirby said: Don't have to remember thanks to Ice-Capades: Job 1 5/6 Yeah, I thought he posted it - I was just too lazy to look for it hehe. Thanks for finding it. Link to comment Share on other sites More sharing options...
akirby Posted February 25, 2019 Share Posted February 25, 2019 6 minutes ago, rmc523 said: Yeah, I thought he posted it - I was just too lazy to look for it hehe. Thanks for finding it. It's also posted in the vehicle specific forum. Link to comment Share on other sites More sharing options...