Jump to content

How Long To Build A 2010 Flex


jrys

Recommended Posts

Can anyone give me a best guess when I can expect a Flex Limited Eco Boost,

which I ordered on 10/28/2009 to be delivered to a Long Island, NY Dealer?

Your dealer should be the best source for that info.

 

My2 cents. When you start your flex, dont touch the accelerater. Let it idle as low as possible for about 30 seconds. This lets oil get to the trubo bearings. Turbos spin up to tens of thousands of RPMs.

 

Same thing when you turn it off. Let it idle for about ten seconds before you shut it off. This gives the turbos time to slow down before you shut off the oil supply to them. In my '04 PSD I could hear the turbo spooling down after I got out of the truck even though I followed this procedure.

 

I am just Old School. You may get different advice.

 

Send us some pics when you get it, you lucky devil.

Edited by DUCKRACER
Link to comment
Share on other sites

Can anyone give me a best guess when I can expect a Flex Limited Eco Boost,

which I ordered on 10/28/2009 to be delivered to a Long Island, NY Dealer?

 

 

I work at the plant. I would guesstimate 2 months. I could get into details about Ford reducing inventory last winter after the market crash, and some problems with the supply chain from India..but it's pretty boring stuff. Hope you enjoy your new Eco Boost Flex!

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...