Jump to content

Ohio Assembly?


waloud

Recommended Posts

launch teams are in dearborn for virtual build, trades have already started removing old equipment to make space for new, we are almost done with launch of (f650-750) on to f250.350,450,super duty, cab chassis

Edited by dingman1
Link to comment
Share on other sites

Won't happen!

KTP builds the best and makes Ford the most profit

 

 

So your saying Ohio is going to take all of KTP's work huh

 

 

Norfolk won a national quality award and its now a parking lot.

Don't ever feel above corporate decisions how or why things are sourced the way they are.

 

OHAP is getting "truck" work. How much is actually sourced there remains to be seen but the change over is in progress and on going.

Link to comment
Share on other sites

so you say your getting aluminum, guess what? that makes us alike. just hearing , mabe f150 commercial fleet orders next, go ,use your resourses that are available to you at work, go to company home page type ohap and current platform you are running and read. I'm sure i'll hear from you soon, and not model,, platform number its different

Link to comment
Share on other sites

launch teams are in dearborn for virtual build, trades have already started removing old equipment to make space for new, we are almost done with launch of (f650-750) on to f250.350,450,super duty, cab chassis

Same thing that I'm hearing. Union told us that it's not going to happen. LOL!!! Ford wants more trucks with beds.

Link to comment
Share on other sites

these orders are commercial fleet no bed, think ma bell truck with small one man lift and work drawers, construction work trucks, service trucks ,cable co. phone co. number hearing per year is 60,000 for these, possible small bed line for outside of u.s. orders, hearing paint already ran trials for aluminum ,,when I say hearing ,cause it was my ears, this is all real, trades in plant have been on full utilization for over a year and if your not a trade and don't know what that means ask one!!!! we are asshole deep in work thru end of year for multiple launches

Link to comment
Share on other sites

these orders are commercial fleet no bed, think ma bell truck with small one man lift and work drawers, construction work trucks, service trucks ,cable co. phone co. number hearing per year is 60,000 for these, possible small bed line for outside of u.s. orders, hearing paint already ran trials for aluminum ,,when I say hearing ,cause it was my ears, this is all real, trades in plant have been on full utilization for over a year and if your not a trade and don't know what that means ask one!!!! we are asshole deep in work thru end of year for multiple launches

You are hearing right. Union told us about 60,000 jobs per year that they are trying to keep at KTP. Nothing but blowing smoke. Our plant looks like a construction zone, building and adding on all over the place.

 

Maybe they can ship the beds to Ohio or Ohio ship the finished truck to KTP

That would be the Ford logic instead of putting a c crew at KTP

C crew is coming back to KTP either before or after the 2017 launch. Keep hearing that they would like to do it before.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...